His memories of Khe Sanh are included the feature-length documentary “Bravo! Common Men, Uncommon Valor.” Sometimes at night, he’d walk the trenches, slipping a shot of whiskey to weary men. More than 60 men in his company died.ĭuring the days and nights of fighting, he was nearly shot in the head. At the time, Pipes commanded Bravo company, which he said was responsible for defending a sector of the main base perimeter during the protracted and bloody battle. That nine-month stretch included the Tet Offensive in 1968 and the 77-day siege of Khe Sanh. From late August 1967 until April 1968, he commanded two companies operating out of the Khe Sanh Combat Base. Pipes found himself in Vietnam, with two sons still in diapers back home. In 1962, during the Cuban Missile Crisis, Pipes was a young officer aboard a ship headed toward the island nation.įive years later, then-Capt. Pipes would spend 25 years in the service - the first three as a reservist, the next 22 on active duty and as a part of history. They were former Marines, and he wanted to be like them. He credits the influence of his college coaches in Fresno for his decision to enlist in 1957. Growing up in Central California, Pipes wasn’t thinking of going into public service. “It gave me an opportunity to continue to serve alongside Marines,” he said, noting that many former Marines move into law enforcement. and Chandler Blvd. Project or call the project hotline at 48.Between the two of them, Ken Pipes figures, they may have done as much 30,000 hours of unpaid work.Īside from his “honest desire to help protect our community,” the reserves job fulfilled another need. There may be a need for driveway restrictions to businesses however, the contractor will ensure there are alternate driveways open for access during any restrictions.įor more details about this project, visit the Sewer & Water Improvements: Dobson Rd. Should disruptions to business or residential water service be needed, those impacted will be notified in advance.Īccess to residences and businesses will be maintained during construction. Water main replacement will take place by trenching and installing pipeline. Bypass pumps and piping will be operated and monitored 24/7 during the sewer rehabilitation and replacement. In some segments, the replacement and relocation of sewer pipe and manholes, along with the abandonment of the old structures, will require trenching and installing the pipeline. This process will reduce construction impacts to nearby businesses and eliminate the need for excavation. ![]() Where possible, the rehabilitation will include the installation of a lining within the existing sewer pipe. Traffic control is expected to remain in place 24/7 to protect the work zone. In addition, water mains prioritized for replacement in the 2018 Water Master Plan will also be replaced from west of Dobson on Chandler Boulevard east to Chippewa Place.ĭuring construction, roads are expected to remain open for travel with lane or turn restrictions where needed. ![]() The assessment program identified the need for improvements near Dobson Road and Chandler Boulevard, which has infrastructure ranging from 35 to 50 years in age. ![]() This area was studied by the City’s Wastewater Sewer Assessment Program that evaluates, prioritizes and makes needed repairs to sewer pipes and manholes. The City is also preparing to install new waterline and service connections on Chandler Boulevard from Dobson Road to Chippewa Place on the north side of Chandler Boulevard and from Dobson Road to Meadows Drive on the south side of Chandler Boulevard.Ĭonstruction is currently scheduled to begin mid-May 2023 with an anticipated completion date of August 2024. – The City of Chandler is preparing to rehabilitate or repair sewer pipe and six manholes near the intersection of Dobson Road and Chandler Boulevard, and in Dobson Road to just north of Galveston Street.
0 Comments
Leave a Reply. |